Ready to Position
To ensure the Kommandoturm would be straight and to help me position it after painting, I added small brass pegs on the bottom which slip onto
corresponding holes on the deck.
|
 Click Once To Enlarge |
|
|
The Lower Observation Deck Completed Here is the basic Kommandoturm and observation deck completed. The upper
observation deck will be built once I have the Aufbau (superstructure) painted.
|
 Click Once To Enlarge |
|
|
Ship's Cranes
The ship's cranes will be built in a later stage, but the lower halves had to be built-in now. I used 13mm (1/2") copper pipe which matched the Pommern Shipyard
drawings perfectly for diameter.
|
 Click Once To Enlarge |
|
|