So Far, So Good
After the second layer was dry, the two halves were carefully pried open, and the funnel master carefully removed. I now had the two halves of my mould, but now came time to make the top.

Click Once To Enlarge
Removing the Putty
A plastic cowling was placed inside the funnel to form the hollow section and then a box was built around the TOP of the funnel section.

Click Once To Enlarge
Final Layer
Petroleum jelly was carefully brushed on the top exposed cured silicone and then the box was was filled with silicone.

Click Once To Enlarge
Back to the Pommern Index Page
Funnels Intro / Funnel Plugs / Cowling / Cowling Mould / Cowling Casting / Funnel Mould / Funnel Casting/ Funnel Assembly / Whistle / Rings / Final Product