|
So Far, So Good After the second layer was dry, the two halves were carefully pried open, and the funnel master carefully removed. I now had the two halves of my mould, but now came time to make the top. |
 Click Once To Enlarge |
| |
|
Removing the Putty A plastic cowling was placed inside the funnel to form the hollow section
and then a box was built around the TOP of the funnel section.
|
 Click Once To Enlarge |
| |
|
Final Layer Petroleum jelly was carefully brushed on the top exposed cured silicone and then the box was was filled with silicone. |
 Click Once To Enlarge |
| |
|
Back to the Pommern Index Page |
|